PROJECT SCHEDULE

Our approach to the design of the Pine Hills Transit Center is based on what we call the five D’s of Design – Desires, Discovery, Discussion, Design, and Documentation. The step by step approach is shown in the flow chart below.

Phase 1 of the design effort is intended to include public outreach and input for the design elements of the transit center resulting in conceptual plans, cost estimates, and design specifications. Phase 2 will include Final Design which will include engineering drawings, permitting, and continued public input for final design. Phase 3 will be construction.